V.E. Unit Retrofit Closure Policy
From BSC Policy
Jump to navigationJump to search
During a time in which a unit is under construction, should any one condition from category 1 (listed under V.D.1) be met or any five conditions from category 2 (listed under V.D.2), the unit will remain closed for the duration of construction.
V.D.1 Category 1
- a. The average per square foot cost of the total construction project exceeds $30/sq. foot of the building.
- b. The project requires the closure of more than 2 floors.
- c. The project blocks or alters primary entrances or exits.
- d. The project requires the rerouting of utilities.
- e. The project calls for the replacement of at least half of the unit’s foundation.
- f. A crane will be used during construction.
- g. The project removes more than one floor of the unit’s fire sprinkler pipes.
- h. The project will take more than one summer to complete.
- i. The project sets unit occupancy below half of its normal level for the semester in which it is to be completed.
V.D.2 Category 2
- a. The work affects the interior and exterior of the building.
- b. Residents will need to walk through construction zones to reach their rooms.
- c. The kitchen will be closed.
- d. Most of the common areas will be closed.
- e. There will be multiple interruptions of utilities as per construction.
- f. A drilling rig will be used during construction.
- g. Energy efficient insulation will be installed in all of the exterior walls.
- h. The fire alarm system will be upgraded during the project.
- i. Only one floor’s fire sprinkler system will be removed.
- j. The project interferes with normal building security (e.g. scaffolding which allows entrance through windows.)
Last modified at Nov 4th 2010 Board meeting